PRODUCT APPLICATION UPDATE ยท OCTOBER 2026

360 Rotating Air Cooler Workshop Placement Checklist

A rotating outlet can help direct airflow toward changing work positions. This checklist helps factory teams describe the site before discussing a mobile 360 rotating air cooler; it does not replace a site-specific layout review.

Hantaitong 360 rotating mobile evaporative air cooler

Mark the active work zones

On a simple plan, identify the workstations, loading positions and temporary production areas that need airflow. Record when people use each zone so placement decisions reflect daily operations.

Check the path of the outlet air

Note machinery, partitions, doors and other obstructions. Leave safe routes around the wheeled unit and discuss how outlet direction can serve the occupied area without interfering with material movement.

Review water, power and service access

Confirm suitable power and water arrangements against the relevant product documentation and local site requirements. Keep access available for routine inspection and qualified service work.

Send a useful enquiry

Share the building dimensions, photos, heat sources and target work zones. View the 360 rotating mobile air cooler and contact Hantaitong to discuss the layout.